Sunday, 17 May 2026

Maintenance work begins at Karnaphuli Tunnel

Chittagong Bureau
Disclosure : 25 Oct 2025, 04:30 PM
Photo collected
Photo collected

Routine maintenance work has begun at Karnaphuli Tunnel in Chittagong from Saturday (October 25). This work will continue from 11 pm to 5 am every day until October 30.

This information was given in a notification signed by Bangladesh Bridge Authority Deputy Director and Public Relations Officer Md. Masud Rana Sikder on Friday (October 24).

The notification further said that during the maintenance work, traffic movement will continue in a controlled manner through traffic diversion from Patenga to Anwara or from Anwara to Patenga. However, passengers may have to wait for a minimum of 5 minutes and a maximum of 10 minutes on both sides of the tunnel, depending on the amount of traffic during this time.

  • Latest

  • Popular

Dubai Taxi to Recruit 6,000 Bangladeshi Drivers

1

Life Imprisonment for Man in Chattogram Drug Case

2

Allegations of Corruption and Abuse of Power Hit Nalchiti Islamia Fazil Madrasa Principal

3

India and UAE Sign Major Defence and Energy Deals During Modi’s Visit

4

Nakba Day / Reflecting on 78 Years of the Palestinian Catastrophe

5

Kathak Recitation Organization Celebrates 26th Anniversary in Nageshwari

6

Six More Children Die of Measles

7

Traffic to be Restricted in Karnaphuli Tunnel for 4 Nights

8

3 arrested with fake notes worth Tk 113,600 in Chittagong

9

Chittagong’s Leather Industry in Crisis

10

Banalata Express Hits OTT on May 24

11

Three-Day Land Service Fair to Begin in Faridpur on May 19

12

Jungle Salimpur Won’t Remain ‘State Within State’: SP Masud

13

British Prime Minister Ready to Resign Amid Labour Crisis

14

Jhalakathi Hospital Water Crisis Leaves Patients and Staff in Distress

15

Writ filed seeking travel ban on Dr. Yunus

16

60 Fishermen Receive Heifer Calves in Muksudpur Gopalganj

17

Rajdhani Express Fire in Rajasthan

18

Two Arrested with 100 Yaba Tablets in Narail

19

Government Losing Nearly Tk 50 Lakh Revenue Due to Lease Crisis in Three Sariakandi Hats

20